Engineering Performance
Main Steam Pipeline Replacement Project of Xinxiang Hongxiang Paper Co., Ltd.
500000 t/a ethylene glycol project 4.0MPa steam pipeline and other additional design services supplementary agreement
4.0MPa
Shandong Hualu Hengsheng Chemical Co., Ltd. Thermal Zone Steam Pipeline Reconstruction Compensator Project
Supplementary Agreement for Design of DN600 Steam Pipe Network Design Engineering in Yucheng Chemical Industry Park
DN60
Weihai Zhongbo Coated Glass Co., Ltd. 6MW Waste Heat Power Generation Steam Pipeline Design Contract Supplementary Agreement
Low pressure feed water 1.5MPa,142 ℃; high pressure feed water 2.94MPa,142 ℃
6MW Waste Heat Power Generation Steam Pipeline Design Project of Weihai Zhongbo Coated Glass Co., Ltd.
DN125, DN200, 2625MPa, 405 ℃
Shandong Jingbo Holding Group Co., Ltd. Hengfeng Branch #5, #6, #7 Furnace Fixed Row, Drainage, Steam Soot Blowing Pipeline Reconstruction Project
Supplementary Agreement on Design of Steam Supply Project in Shandong Laicheng Industrial Zone
Design of Heating Pipe Network and Heat Exchange First Station of Domestic Waste Incineration Power Generation Project in Wendeng District of Weihai City
Steam Pipeline Project from Shenghe Thermoelectric to Bohai Oil Refining Workshop
5.3MPa,320℃,DN65,750m
Pipe Network Project of Xinjiang Heyuan Zhengda Biochemical Co., Ltd.
DN600、DN200
Shandong Luyu Bochuang Aluminum Co., Ltd. Heating Center Cogeneration Project 2 × 25MW Unit Pressure Pipe Engineering Design Service
Steam Heating Network Project of Rongcheng Changqing Heating Co., Ltd. (OSA Pharmaceutical Branch)
1.0MPa,230℃,1.5km
Supplementary Agreement for Steam Piping Project from Shenghe Thermoelectric to Bohai Oil Refining Plant
Yili Jieneng Technology (Jinxiang) Co., Ltd. Steam Pipe Network Expansion Project
1.6MPa,250℃,DN300,1km,DN200,0.2km
Supplementary Agreement on Design of Desulfurization Flue Reconstruction Project of Heat Supply Center
Shandong Laicheng Industrial Zone Steam Supply Project Design Supplementary Agreement
Supplementary Agreement on Design of Coal Water Slurry Cogeneration Reconstruction Project in Heshun County, Shanxi Province
Hualu Power Plant Steam Production Department Internal Steam Pipe Network Optimization Project
DN600,1.9MPa, 260 ℃,1000m
Design of Phase III (1500) of Outer Tube of Huaneng Power Plant for Amide and Nylon New Material Project
1.8MPa,700t/h、0.7MPa,200t/h、600t/h