engineering case
Longdong UHV Project Supporting New Energy Demonstration Project
The installed capacity is 481.8MWp, the planned installed capacity of wind power is 376 MW, the installed capacity of photovoltaic is 105 MW, the collector line is 178km, and there is one 330KV booster station.
Phase I Construction Project of Aksai Zhonghong Holding Group Co., Ltd.
New quartz comprehensive workshop, (pickling) (crushing), finished product warehouse (1-4) staff dormitory building, comprehensive office building, doorman, with a total construction area of 96973.13 square meters and a total investment of about 0.2 billion yuan.
Yantai Hengbang Chemical Co., Ltd. Cogeneration Project
Newly built 2 × 240th boiler 1 × 30MW steam turbine generator set and auxiliary installation project; 8Km steam pipe network installation project from power plant to Yantai brewery.
New 1x1130th Supercritical Boiler 1x 350MW Turbine Generator Set Attached Installation Project, Dongfang Electric Group Dongfang Boiler Co., Ltd., C350300-24.2566566 Steam Turbine, Harbin Steam Turbine Factory Co., Ltd.