Dongying Haixin Thermal Power Supply Company Cogeneration Central Heating Project


Scales

3 × 480 t/h high temperature and high pressure circulating fluidized bed boiler and 2 × 50MW back pressure steam turbine generator set; The first station with a heating capacity of 10 million square meters; 110kv transmission line 18km