Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

Shanxi Shuguang Building Materials Co., Ltd. annual output of 100 million pieces of coal gangue sintered brick production line desulfurization, denitrification, wet electric dust removal project technical service contract.

Anhui Dongzhi Guangxin Agrochemical Co., Ltd. 1 × 260 t/h Boiler and Its Supporting Facilities Project-Boiler Flue Gas Desulfurization and Dust Removal Project

Liaoning Dandong Huafu Thermal Power Plant 3 × 280 t/h Boiler Flue Gas Environmental Protection Project

Huaibei Xinyuan Thermal Power Co., Ltd. Xinyuan Thermal Power Desulfurization Wastewater Treatment Project

Jiangsu Fangcheng Environmental Protection Technology Co., Ltd. 4000 Standard Party Flue Gas Environmental Protection Treatment Project

Full Load Denitration Project of #4 Unit Flexible Transformation of Shaanxi Weihe Power Generation Co., Ltd.

Manufacturing and Installation Contract of Flue Gas Denitration Equipment of Chifeng Zhongtang Special Steel Co., Ltd.

Huadian Laizhou Power Generation Co., Ltd. 1000MW coal-fired thermal power unit full-time denitrification technology research and demonstration project equipment and construction EPC contract.

Sailun Group Cambodia CART Thermal Power Plant Phase II Project Boiler Bag Dust Collector

Environmental Protection Island (Denitration, Dust Removal and Denitration System) Project for Boiler of Cogeneration Project of Henan Zhonghe Thermal Power Co., Ltd.

Shandong Haihua Energy Co., Ltd. Thermal Power Branch New Plant 6#, 11#, 12# Dust Collector Application Test Project Contract

Qingdao Energy Thermal Power Co., Ltd. First Thermal Power Branch Western Heating Station 2 × 75 t/h Boiler Ultra-low Emission Reconstruction Project (Denitration)

Chifeng Defeng Coking Co., Ltd. Flue Gas Desulfurization, Denitration, Dust Removal and Waste Heat Recovery

2024 heat source safety and environmental protection production guarantee project (coal-fired boiler ultra-low emission transformation) (design)

3 × 90 t/h Coal-fired Circulating Fluidized Bed Boiler Flue Gas Treatment Project of Jiande Dayang Tongchuang Thermal Power Co., Ltd.

3 × 90 t/h boiler

Shandong zouping hongxu thermal power co., ltd. newly built 220KV zouwei line survey and design project, with a length of 40 kilometers

Design and Survey Project of 110KV Boxing Substation of Shandong Binzhou Binbei New Material Co., Ltd.: 37km

Shandong Binzhou Binbei New Materials Co., Ltd. Binzhou 220KV Power Supply Line Project: 40km, 3km across the Yellow River

Shandong Zouping County Huineng Thermal Power Co., Ltd. Changshan 220kV Substation and New 220kV Line Project: 18km

Xinjiang Kurutai Grassland Ecological Restoration Project 35 kV Power Transmission Project, 23km Line