Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

Steam pipe network design project

5.3km,DN250-DN500,1.0MPa,250℃

3.5MPa Steam Optimization Project

Steam Pipeline Design of Shouguang Changxu Thermal Power Co., Ltd.

1.2MPa,320℃

New Pipe Network Project of Jining Shengtang Energy Co., Ltd.

DN150-DN200,1.0MPa,220℃,950m

Design Project of External Piping of Industrial Heating Residual Steam Utilization Project

New Steam Pipe Network Project of Wudi Xinyuan Thermal Power Co., Ltd.

DN300-DN200,1000m,0.6MPa,160℃

China Energy Saving (Feicheng) Biomass Energy Thermal Power Co., Ltd. Launching External Steam Supply Project

DN400,4.8km,1.0MPa, flow rate 45.0 t/h (maximum 60.0 t/h)

Northern Linzi Thermal Center Project

7.9km, initial 1.6MPa,300 ℃, end 0.8MPa,190 ℃,100-120 tons/hour

Dezhou Shihua Chemical Co., Ltd. East Line Steam Pipe Network Area Continuous Central Heating Substitution Department Dispersed Coal-fired Boiler Project

1.3MPa,245℃,DN500,1.9km;DN350,0.65km;DN300,0.9km

Design of Steam and Hydrochloric Acid Pipeline in Ye County Advanced Manufacturing Development Zone of Pingdingshan

0.8MPa,25t/h

1# turbine exhaust pipe and Jiayou fertilizer heating pipe design project

0.8MPa,280℃,DN600,93m;DN250,128m,0.8MPa,250℃

Hefei Lujiang Chemical Industry Park Heating Pipe Network Project

DN125-DN600,8.5km

Design of Steam Pipeline for Qingdao West Coast Biomass Thermal Power Co., Ltd

DN400,2km,0.98MPa,270℃

Installation Diagram of Primary Steam System Pipeline of Oxygen Pressure Leaching Exhaust Steam Deep Dehumidification and Waste Heat Recovery Project of Hulunbeier Chihong Mining Co., Ltd.

Maoming Changqing Cogeneration Project Zhonghe Chengchi Steam Pipe Network Project

Chengwu County Chemical Industry Park Central Heating Network Infrastructure Construction Project

DN600 about 13km 1.2MPa, 315 ℃

Wudi County Xinxing Thermal Power Co., Ltd. Decompression Station and Steam Pipe Network Project

Steam parameters: 1.0MPa,300 ℃,

National Energy Group Taian Thermal Power Co., Ltd. #1, 2 units heating season flexibility renovation project high side heating pipeline renovation design service contract.

25.4MPa before high bypass valve and 5.483MPa after high bypass valve; Design temperature: 576 ℃ before high bypass valve and 346.6 ℃ after high bypass valve. The maximum flow of high bypass pipeline is 460 t/h.

General Contract of DN600 Main Pipeline Project of Steam Pipe Network in Yucheng Chemical Industry Park (North Extension Phase I)

DN600,0.98MPa, design temperature 300 ℃

Everbright Environmental Energy (Ninghai) Co., Ltd. New Heating Project Design Service

Annual steam supply 32487 tons, annual power supply 7.8 million kW/h

< 1...78910 >