Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

National Energy Group Taian Thermal Power Co., Ltd. #1, 2 units heating season flexibility renovation project high side heating pipeline renovation design service contract.

25.4MPa before high bypass valve and 5.483MPa after high bypass valve; Design temperature: 576 ℃ before high bypass valve and 346.6 ℃ after high bypass valve. The maximum flow of high bypass pipeline is 460 t/h.

General Contract of DN600 Main Pipeline Project of Steam Pipe Network in Yucheng Chemical Industry Park (North Extension Phase I)

DN600,0.98MPa, design temperature 300 ℃

Everbright Environmental Energy (Ninghai) Co., Ltd. New Heating Project Design Service

Annual steam supply 32487 tons, annual power supply 7.8 million kW/h

Steam Pipe Network Supporting Project of Zhanhua Economic Development Zone Infrastructure Upgrading Project (Phase I)

2km,DN350~DN150

Yucheng Chemical Industry Park Baoledo to Chuangxin Street Steam Pipe Network Reconstruction Project

DN600,0.98MPa,300℃

Design service of heating and steam supply pipe network construction project (#2 heating first station expansion project) of Sishui Shengyuan Thermal Power Co., Ltd.

A new 2# heat exchange first station will be built, with a heating area of more than 5 million square meters, supporting the steam and hot water pipe network in the plant area, water expansion and denitration agent storage tank capacity increase design.

Contract for design, preliminary design and construction drawing of partial diversion scheme to heating pipeline plant in economic development zone

Design of Steam Pipeline from Energy Division to Protein A Area

1.0MPa,300 ℃, pipe diameter DN500, pipe path length about 1000 m

2023 Yellow River Delta Standardization Plant Xingyue Home Textile Steam Pipeline Reconstruction Project

New DN300 steam pipeline, path length about 600m

Replacement Design of Main Steam Pipes of Units 3 and 4

Survey and design contract for the "three electricity" and pipeline relocation (Hebei section) of the newly-built Beijing-Xiongshang high-speed railway xiong'an new area to Shangqiu section

Involving DN200-DN1600 heat pipe 11

Qingdao Xinao Energy 2023 and 2024 Annual Contract for Design of Heating, Cooling and Steam Supply Project

Qingdao Xinao Clean Energy 2023 and 2024 Two-year Heating, Cooling and Steam Engineering Design Service Contract

Qingdao New Aohaizhi Energy 2023 and 2024 Two-year Heating, Cooling and Steam Engineering Design Service Contract

Wuzhong Taiyangshan Development Zone Chemical Industry Park North Steam Pipe Network Construction Project Feasibility Study Report Technical Consulting Service Contract

The maximum/minimum/average steam consumption for design industrial production is about 102/28/60(t/h); The straight line distance of the newly-built steam pipeline route is about 3.5km

Contract for Design of Zhanhua Alumina Steam Supply Pipeline of Binzhou Zhanhua District Haineng Thermal Power Co., Ltd.

Parameters: pressure 7.0MPa, temperature 320±10 ℃, total flow of pipeline is about 480 t/h. Parameters: pressure 7.4MPa, temperature 340 ℃, flow rate about 825 t/h.

Design of Hengye No.4 Steam Pipeline Reconstruction Project of Zhanhua Economic Development Zone Infrastructure Upgrading Project

DN450/DN195

Steam Pipe Network Supporting Project of Zhanhua Economic Development Zone Infrastructure Improvement Project (Niuhua, Harmony New Material Section)

Bid Section 2 of EPC General Contracting Project (Phase I) for Urban Heating and Gas Supply Reconstruction and Upgrading in Zhanhua District of Binzhou City

About 16.5km, DN≥ 600

Shandong Bohai Oil Industry Co., Ltd. 1.5 million tons of feed protein and by-product deep processing project steam pipe network engineering design contract.

0.8MPa, 220 ℃, 50 t/h, steam supply end is 0.98MPa, 270 ℃, steam supply pipeline is proposed to use DN500, GC1 grade