Thermoelectric upgrading project

1 × 220 t/h 1 ×B25MW

Chemical Supporting Thermal Power Plant Project

2 × 240 t/h 1 × 25MW

Science and Technology New City Heating Station Phase II

1 × 240 t/h 1 × 50MW

240 t/h CFB boiler works

1 × 240 t/h

Heat supply engineering

2 × 240 t/h 2 ×B25MW

Self-provided Power Plant Phase III

1 × 300 t/h 1 ×C 60MW

Expansion of furnace 11

1 × 240 t/h(CFB)

5# boiler expansion project

1 × 240 t/h

2 × 220 t/h heating boiler project

2 × 220 t/h 2 × 50MW

Expansion of 4# unit of boiler 6 and 7

2 × 240 t/h 1 ×C 50MW

12 boiler expansion project

1 × 240 t/h

1 × 240 t/h boiler works

1 × 240 t/h boiler

Power workshop expansion project

1 × 220 t/h 1 ×B25MW

Gas power generation project

2 × 65 t/h 2 × 15MW;1 × 240 t/h 1 × 60MW

Sci-tech New Town #3 Unit Expansion

1 × 240 t/h 1 × 50MW

Fan County Puwang Heating Project

3 × 240 t/h 3 × B25

Heating Station Project

4 × 240 t/h 4 × 60MW

Expansion of Generator Unit 4

1 × 240 t/h 1 ×CC 50MW

Power workshop expansion project

1 × 240T 1 × 25MW 1 × 12MW

Temperature and pressure reducing system engineering

1 × 200 t/h