Design Outsourcing Contract of Yanshan Yahui Salt Industry Co., Ltd.

Anqiu Tianyu Thermal Power Co., Ltd. Steam Pipe Network Reconstruction Project

DN600,340m

Fujian Sanjin Iron and Steel Co., Ltd. 660m ³ Blast Furnace Gas Waste Heat Power Generation Project Low Pressure Steam Pipeline

Engineering Design of External Network Steam Pipeline for External Heating Project of Shiheng Special Steel Group Co., Ltd.

DN350,1400m,2.0MPa(A),320℃

Shandong Dongyue Fluorine Silicon Material Co., Ltd. Tangshan Thermal Power Plant to Dongyue Silicone Company Heating Pipe Network Project

DN700 steam supply pipeline is about 3500 meters long, DN600 steam supply pipeline is about 300 meters long

Construction Drawing Design of Steam Pipe Network Optimization and Reconstruction Project in North District

New DN250 steam pipeline, new 70 t/h pressure reducer and new DN500 steam pipeline

Steam pipeline works in the plant area

0.3MPa,1.5MPa,2.5MPa,4km

Design of Main Steam Pipeline for New Plant of Thermal Power Branch

Steam Pipeline Design Project of Zouping County Electric Power Group Co., Ltd.

4 sets of steam-driven pumps in the first heating station

Design Project of Fufeng Longjiang Company Using Waste Heat to the First Station of Urban Heating in Angangxi District

Huaneng Jiaxiang Power Generation Co., Ltd. New Heating First Station Project Design Contract

Main Steam Pipeline Reconstruction Project of Shandong Shenghe Thermal Energy Co., Ltd.

The design pipe diameter is DN300, and the design parameters are 5.29MPa and 485°C. The pipeline length is about 40m.

Xiangyang Company Industrial Park Heating Capacity Expansion Renovation and Ammonia Zone Standby Steam Renovation Project Feasibility Study Service Project

The steam pressure is 0.6-1.5MPa, the temperature is 200-260 ℃, the designed maximum steam flow rate is 100 t/h, and the pipeline length is about 5 kilometers.

Steam Pipe Network (Baolingbao Branch Pipeline) Project in Yucheng Chemical Industry Park

The steam pipeline of the south branch DN500-DN400 is connected to the south area of Baolingbao factory area, with a length of about 400m; the north branch DN400 steam pipeline is connected to the north area of Baolingbao factory area, with a length of about 200m.

Yuncheng kangpingna intelligent dyeing co., ltd. annual output of 100000 tons of cheese yarn intelligent dyeing garden construction project

Plant steam pipeline, 1#, 3# yarn dyeing workshop compressed air pipeline and steam pipeline

Design Service of Pan-energy Project in Jining Food Development Zone

Design of energy station system and steam pipe network in the park

Zouping Sidian-Shandong Samsung Corn Industry Technology Co., Ltd. Steam Pipeline Project

The length of the steam pipeline from Zouping Sidian to Samsung Power Plant is about 8 kilometers.

Zibo City Urban Expressway Network (Phase I) Pipeline Relocation and Heating Project (Section Sibaoshan Road Steam Pipeline

0.8MPa, about 250°C

Hong Kong Tau Chen Heat Exchange Station and Steam Pipeline Reconstruction Project (Design)

Primary network DN150/400 steel sheath steel steam pipeline transformed into high temperature water pipeline

Wudi County High White Poplar, Logistics Park Pipeline Reconstruction and Industrial Park Steam Pipe Network Extension Project

DN300 is reserved for valves and extended to Shandong Ruiheng Residential Industrial Technology Co., Ltd.; the whole plant is about 1.6km.