Inner Mongolia Lingsheng Crop Technology Co., Ltd. Back Pressure Central Heating Project
Scale: 2 × 500 t/h high temperature and high pressure coal-fired circulating fluidized bed boiler 1 × B60MW back pressure unit.
Ningxia Shengyan Industrial Group Fuhua Metallurgical Co., Ltd. Power Station
Scale: 2 × 480th high temperature and ultra high pressure once intermediate reheat circulating fluidized bed boiler 2 × 150MW air-cooled condensing unit.
Engineering Design of Cogeneration Project of Shandong Fengtong Thermal Power Co., Ltd
Scale: 1 x 410th high temperature ultra high pressure pulverized coal furnace 1 x B50MW pumping back unit.
Shandong Xingda New Energy Co., Ltd.
2 × 490th high temperature and ultra-high pressure primary intermediate reheat pulverized coal boiler 2 × C150MW ultra-high pressure unit and 1 × 490th high temperature and ultra-high pressure pulverized coal furnace 1 × B60MW back pressure unit.
Weiqiao Group Huji Power Plant Phase II
Scale: 4 × 1250 subcritical primary intermediate reheat pulverized coal furnace 4 × 350MW unit.
Weiqiao Thermal Power Group Fly Ash Comprehensive Utilization Energy Branch
Scale: 8 × 480 t/h high temperature and high pressure boiler 8 × 60MW pumping back pressure unit, the largest back pressure unit group in China.
Yiyuan Yuaneng Thermal Power Company
Scale: 2 × 260th subcritical ultra-high temperature circulating fluidized bed boiler 2 × B50MW back pressure unit, the first 50MW subcritical ultra-high temperature parameter in China.
Changzhi Huoshi Group Electric Power Company Technical Transformation
Scale: 1 × 480th high temperature and ultra-high pressure circulating fluidized bed boiler 1 × 150MW pumping back unit, the first domestic pumping, condensing and back air cooling unit.