Leling Jason Thermal Co., Ltd.


Leling Jason Thermal Co., Ltd.1 × 58MWThe hot water boiler shall be equipped with an ultra-low emission device with 110% flue gas treatment capacity, SNCR denitration, calcium spray + circulating fluidized bed semi-dry desulfurization process in the furnace, rotary blowing bag filter, and one furnace and one tower arrangement. SNCR denitration adopts 20% ammonia solution as denitration agent, limestone as desulfurization agent is used for spraying calcium in the furnace, slaked lime Ca(OH)2 as desulfurization agent is used for semi-dry desulfurization, rotary jet ultra-clean bag filter is used for dust removal, and the desulfurization device is put into operation synchronously with the main engine.

The initial design of this project has been completed, the design of the as-built drawing has been completed by more than half, and the equipment, materials and installation and construction units are ready to invite bidding. The contact number of the bidding and settlement department is 0531-69959255.