Tender for Civil Engineering Team of Peak Thermoelectric Gas Recovery and Comprehensive Utilization Project


Zouping Peak Thermal Power Co., Ltd. Gas Recoveryresource utilizationcomprehensive utilization projectConstruction of 1 × 150 t/h ultra-high temperature and ultra-high pressure gas boiler 1x 50MW primary intermediate reheat condensing steam turbine 1x 60MW generator set, the project is constructed and operated by Shandong Huaneng Design Institute Co., Ltd. in BOT mode, and handed over to the owner upon expiration of the operation period..

The three major hosts of the project have already been invited for bidding, and the bidding for civil installation and construction is now being prepared. If you are interested in participating, please contact the bidding and settlement department 0531-69958043