Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

Phase II Expansion Project

1 × 220 t/h 1 ×B25MW

Comprehensive utilization of waste heat and pressure

3 × 220 t/h 3 ×CC 25MW

Phase II Continuation Project

1 × 240 t/h 1 ×C 25MW

Thermal power plant engineering

3 × 260 t/h 1 ×B25MW

Phase II Expansion Project of Thermal Power Plant

2 × 260 t/h 1 × 170 t/h 1 × B25

Phase II Expansion Project of Thermal Power Plant

1 × 240 t/h 1 ×B 50MW

Thermal Power Plant Phase III Expansion Project

1 × 240 t/h 1 × B50

Energy Saving Project of Acetic Acid Plant

1 × 200 t/h

Thermoelectric upgrading project

1 × 220 t/h 1 ×B25MW

Chemical Supporting Thermal Power Plant Project

2 × 240 t/h 1 × 25MW

Science and Technology New City Heating Station Phase II

1 × 240 t/h 1 × 50MW

240 t/h CFB boiler works

1 × 240 t/h

Heat supply engineering

2 × 240 t/h 2 ×B25MW

Self-provided Power Plant Phase III

1 × 300 t/h 1 ×C 60MW

Expansion of furnace 11

1 × 240 t/h(CFB)

5# boiler expansion project

1 × 240 t/h

2 × 220 t/h heating boiler project

2 × 220 t/h 2 × 50MW

Expansion of 4# unit of boiler 6 and 7

2 × 240 t/h 1 ×C 50MW

12 boiler expansion project

1 × 240 t/h

1 × 240 t/h boiler works

1 × 240 t/h boiler