Circular Economy Demonstration Project of Comprehensive Utilization of Coal Resources

2 × 240 t/h 2 × 50MW

Yixian County Industrial Agglomerate District Central Heating

1x300T/H 1 × 30MW

Rongcheng Shidao Management Area Cogeneration PPP Project

2x 240 t/h 1x 75 t/h 1 set B30MW 1 set B9MW

Power Plant Project of Indonesia Wanxiang Nickel Co., Ltd.

2 × 280 t/h 2 × 65MW

Cogeneration project

2 × 240 t/h 2 × 30MW 1 × 12MW

2 × 260 t/h 2 × 30MW units

2 × 260 t/h 2 × 30MW

Reconstruction and expansion of 220 t/h boiler

1x220t/h

Residual heat and pressure cogeneration

1xB30MW

3# turbine renovation project

30MW unit

Hot water gas boiler

3 × 70MW

Gaotai County District Central Heating

4 × 58MW hot water boiler room

Xiaozhao Heat Source Plant Gas Boiler

2 × 58MW gas-fired hot water boiler

Liaoning Anlian Thermal Power Co., Ltd. Phase I rear-mounted unit

2 × 220 t/h 2 × B25

Zibo Xinsheng Thermal Power Co., Ltd. Expansion Project

1 × CB25MW,6 million flat heat exchange station

1 × 50MW subcritical ultra-high temperature back pressure cogeneration unit

1 × 260 t/h 1 × 50MW heat exchange first station

Heating Center Cogeneration Project

2 × 240 t/h 2 ×B25MW

Rongcheng Island Management District Cogeneration PPP Project Phase II

1 set 240 t/h

Retrofit of 135MW unit

1xN135MW retrofitted to 1xB85MW 1xN40MW

Design of No.2 Thermal Power Plant

2 × 240 t/h 2 × 25MW

Heihe Thermoelectric Flue Gas Waste Heat Deep Recovery Project

3 × 220 t/h, 2 × 75 t/h, 2 × 65 t/h, 1 × 75 t/h