engineering case
Jinan Thermal Power Co., Ltd. Northern Suburb Lan Carbon Hot Water Boiler Ultra-low Emission Project
Classification:
The project includes turnkey projects for limestone-gypsum wet desulfurization, wet electrostatic precipitator, SNCR denitration system, bag filter, wastewater treatment system and other supporting public systems, including design, civil engineering, procurement, construction and acceptance. The total contract cost is about 50 million yuan, ensuring that the two blue carbon hot water boilers can achieve ultra-low emission within 30~100 load.
Description
The project includes turnkey projects for limestone-gypsum wet desulfurization, wet electrostatic precipitator, SNCR denitration system, bag filter, wastewater treatment system and other supporting public systems, including design, civil engineering, procurement, construction and acceptance. The total contract cost is about 50 million yuan, ensuring that the two blue carbon hot water boilers can achieve ultra-low emission within 30~100 load.
Key words:
Previous article:
Online consultation
If you have any questions about engineering, please contact us immediately, we will arrange professionals to reply to you as soon as possible.




