Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

+

Wuzhong Taiyangshan Development Zone Chemical Industry Park North Steam Pipe Network Construction Project Feasibility Study Report Technical Consulting Service Contract

Classification:


业绩规模

The maximum/minimum/average steam consumption for design industrial production is about 102/28/60(t/h); The straight line distance of the newly-built steam pipeline route is about 3.5km

Description

Key words:

Online consultation


If you have any questions about engineering, please contact us immediately, we will arrange professionals to reply to you as soon as possible.

Product Name:

Submit immediately