Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

+

Steam Pipe Network (Baolingbao Branch Pipeline) Project in Yucheng Chemical Industry Park

Classification:


业绩规模

The steam pipeline of the south branch DN500-DN400 is connected to the south area of Baolingbao factory area, with a length of about 400m; the north branch DN400 steam pipeline is connected to the north area of Baolingbao factory area, with a length of about 200m.

Description

Key words:

Online consultation


If you have any questions about engineering, please contact us immediately, we will arrange professionals to reply to you as soon as possible.

Product Name:

Submit immediately