engineering case
Sports Institute Project (Qihe No.1 Middle School Gymnasium)
Completed industrial and civil construction area of more than 2000 million square meters
Longdong UHV Project Supporting New Energy Demonstration Project
The installed capacity is 481.8MWp, the planned installed capacity of wind power is 376 MW, the installed capacity of photovoltaic is 105 MW, the collector line is 178km, and there is one 330KV booster station.
Phase I Construction Project of Aksai Zhonghong Holding Group Co., Ltd.
New quartz comprehensive workshop, (pickling) (crushing), finished product warehouse (1-4) staff dormitory building, comprehensive office building, doorman, with a total construction area of 96973.13 square meters and a total investment of about 0.2 billion yuan.
Yantai Hengbang Chemical Co., Ltd. Cogeneration Project
Newly built 2 × 240th boiler 1 × 30MW steam turbine generator set and auxiliary installation project; 8Km steam pipe network installation project from power plant to Yantai brewery.
New 1x1130th Supercritical Boiler 1x 350MW Turbine Generator Set Attached Installation Project, Dongfang Electric Group Dongfang Boiler Co., Ltd., C350300-24.2566566 Steam Turbine, Harbin Steam Turbine Factory Co., Ltd.
Scale: 4 × 240th high temperature and high pressure pulverized coal boiler +4 × 60MW extraction condensing unit and 4 × 480th high temperature and ultra high pressure primary reheat pulverized coal boiler +4 × 150MW unit. The smoke tower integration technology adopted is the only project in Shandong Province and won the third prize for excellent design in Shandong Province.
Inner Mongolia Lingsheng Crop Technology Co., Ltd. Back Pressure Central Heating Project
Scale: 2 × 500 t/h high temperature and high pressure coal-fired circulating fluidized bed boiler 1 × B60MW back pressure unit.
Ningxia Shengyan Industrial Group Fuhua Metallurgical Co., Ltd. Power Station
Scale: 2 × 480th high temperature and ultra high pressure once intermediate reheat circulating fluidized bed boiler 2 × 150MW air-cooled condensing unit.
Engineering Design of Cogeneration Project of Shandong Fengtong Thermal Power Co., Ltd
Scale: 1 x 410th high temperature ultra high pressure pulverized coal furnace 1 x B50MW pumping back unit.
Shandong Xingda New Energy Co., Ltd.
2 × 490th high temperature and ultra-high pressure primary intermediate reheat pulverized coal boiler 2 × C150MW ultra-high pressure unit and 1 × 490th high temperature and ultra-high pressure pulverized coal furnace 1 × B60MW back pressure unit.