engineering case
Jinan Thermal Power Co., Ltd. Northern Suburb Lan Carbon Hot Water Boiler Ultra-low Emission Project
The project includes turnkey projects for limestone-gypsum wet desulfurization, wet electrostatic precipitator, SNCR denitration system, bag filter, wastewater treatment system and other supporting public systems, including design, civil engineering, procurement, construction and acceptance. The total contract cost is about 50 million yuan, ensuring that the two blue carbon hot water boilers can achieve ultra-low emission within 30~100 load.
Laizhou Tushan Phase I 600MW Photovoltaic Power Generation Project 300MW Sending Project
The project belongs to the supporting transmission line of new energy construction, with a route of 26 kilometers and a voltage level of 220kV. The project includes the compensation for land acquisition in the three villages and towns of Hutouya, Shahe and Tushan, especially the economic compensation related to the saltworks. Apart from the project itself, there are many difficulties. Through the active coordination and active docking between the company and the project department, the coordination has been basically completed, and the normal construction has been organized, it has been recognized by the owner and accumulated valuable engineering experience.
It is the representative performance of many industrial and commercial distributed photovoltaic general contracting projects completed by our company. It has been fully connected to the grid in September. Now it is in the process of acceptance and rectification. The overall project has short duration, standardized management and high construction completion, which has won unanimous praise from the owner unit, Party A and the supervisor.
Shaanxi Weihe Power Generation Co., Ltd. #3 Unit, #4 Unit Flexibility Reconstruction Project
Shandong Huaneng is responsible for the design and construction of the full-time flexibility renovation project for units above 300MW, the full-load denitration project renovation project for four 1024th boilers, the supply of all equipment and materials, related design, construction, installation, commissioning, performance test, trial operation, personnel training, technical guidance, and final delivery.
Zaozhuang tax Guo water floating 5.3911MW distributed photovoltaic project
This project is the first water floating distributed photovoltaic general contracting project undertaken by our company. The project uses three waste ponds in the original mining area and adopts floating photovoltaic. In response to the spirit of rural revitalization, it has undertaken the turnkey project from geological exploration to design, procurement and construction. Now the main body of the project has been basically completed and the acceptance is planned to be completed in the near future.