Huaneng Design Institute

Design consulting EPC general contracting project supervision and other whole process professional service institutions

Notice on Issuing the Work Plan of Shandong Province to Promote Equipment Renewal in the Field of Construction and Municipal Infrastructure

2024-05-09

Shandong Provincial Department of Housing and Urban-Rural Development 2024-05-0818:15 Shandong Municipal Housing and Urban-Rural Development Bureau, Urban Management Bureau, Development and Reform Commission, Finance Bureau, Natural Resources Authority, Market Supervision Administration, People's Bank of China Qingdao Branch, Municipal Branches, Jinan, Qingdao, Zibo, Zaozhuang, Dongying, Jining, Weihai, Binzhou, Heze City Water Affairs (Water Conservancy) Bureau: the "Shandong Province's Work Plan for Promoting Equipment Renewal in the Field of Construction and Municipal Infrastructure" is hereby printed and distributed to you. Please combine the actual situation and earnestly implement it. Shandong Provincial Department of Housing and Urban-Rural Development Shandong Provincial Development and Reform Commission Shandong Province

Xi Jinping: China's new energy industry does not have the so-called "China's overcapacity problem"

2024-05-08

Photovoltaics 2024-05-0712:29 Beijing Xinhua News Agency reported that on the morning of May 6, local time, President Xi Jinping was invited to hold a tripartite meeting with French President Macron and European Commission President von der Leyen at the Elysee Palace in Paris. Xi Jinping pointed out that China has always viewed China-EU relations from a strategic and long-term perspective, and regards Europe as an important direction of major-country diplomacy with Chinese characteristics and an important partner in realizing Chinese-style modernization. He hopes that China-France relations and China-EU relations will promote each other and develop together. Today's world has entered a new turbulent period of change, China and Europe, as two important forces, should adhere to

Notice of the National Energy Administration on Issuing the Guiding Opinions on Energy Work in 2024

2024-05-07

National Energy Development Plan [2024] No. 22 The energy bureaus of all provinces (autonomous regions and municipalities directly under the Central Government), the development and reform commissions of relevant provinces (autonomous regions and municipalities directly under the Central Government) and the Xinjiang Production and Construction Corps, china National Nuclear Corporation, PetroChina, Sinopec, CNOOC, National Pipeline Network Group, State Grid, China Southern Power Grid, China Huaneng, China Datang, China Huadian, State Power Investment, China Three Gorges Group, National Energy Group, State Investment, China Resources Group, China Coal Group, China General Nuclear Power: In order to thoroughly implement the relevant decisions and deployments of the Party Central Committee and the State Council, we will do a solid job in energy work in 2024 and continue to promote high-quality development.

We participated in the design of the world's largest compressed air energy storage project grid-connected power generation

2024-05-01

At 11: 18 a.m. on April 30, Shandong Feicheng International's first 300MW/1800MWh advanced compressed air energy storage national demonstration power station with completely independent intellectual property rights was successfully connected to the grid for the first time. The power station adopts the advanced compressed air energy storage technology independently developed by the Institute of Engineering Thermophysics of the Chinese Academy of Sciences. China Storage National Energy (Beijing) Technology Co., Ltd. is the investment and construction unit, and Shandong Environmental Energy Design Institute Co., Ltd. is responsible for the design. The new type of compressed air energy storage power station with the largest scale, the highest efficiency, the best performance and the lowest cost.

Shandong Feicheng 300MW/1800MWh Advanced Compressed Air Energy Storage National Demonstration Power Station Successfully Connected for the First Time

2024-05-01

Shandong Feicheng 300MW/1800MWh Advanced Compressed Air Energy Storage The national demonstration power station was successfully connected to the grid for the first time. Figure 1 Shandong Feicheng 300MW Advanced Compressed Air Energy Storage National Demonstration Power Station At 11: 18 a.m. on April 30, Shandong Feicheng International's first 300MW/1800MWh advanced compressed air energy storage national demonstration power station with completely independent intellectual property rights was successfully connected to the grid for the first time. The power station adopts the advanced compressed air energy storage technology independently developed by the Institute of Engineering Thermophysics of the Chinese Academy of Sciences. China Storage National Energy (Beijing) Technology Co., Ltd. is the investment and construction unit, and Shandong Environmental Energy Design Institute Co., Ltd. is responsible for the design. The new type of compressed air energy storage power station with the largest scale, the highest efficiency, the best performance and the lowest cost. Fig.2 Control Room of 300MW Advanced Compressed Air Energy Storage National Demonstration Power Station in Feicheng, Shandong Province The construction scale of the power station is 300MW/1800MWh, the total project investment is 1.496 billion yuan, and the rated design efficiency of the system is 72.1. It can realize continuous discharge for 6 hours, generate about 0.6 billion degrees of electricity per year, and provide power guarantee for about 20-300000 households at the peak of electricity consumption, which can save about 189000 tons of standard coal and reduce carbon dioxide emissions by about 490000 tons per year. The power station uses the abundant underground salt cavern resources in Feicheng City, Shandong Province to store gas, and uses air as a medium to realize large-scale power storage on the power grid side. It can provide power regulation functions such as peak adjustment, frequency modulation, phase adjustment, backup, black start, etc. for the power grid, and effectively support the smooth and efficient operation of the power system. Figure 3 Main Building of 300MW Advanced Compressed Air Energy Storage National Demonstration Power Station in Feicheng, Shandong Province Figure 4 Booster Station of 300MW Advanced Compressed Air Energy Storage National Demonstration Power Station in Feicheng, Shandong Province Feicheng 300MW advanced compressed air energy storage project is successfully connected to the grid with the support of Shandong provincial governments at all levels, the Development and Reform Commission and the Energy Bureau, and with the help of the special grid-connected service of State Grid Shandong Electric Power Company, which is an important milestone in the field of compressed air energy storage, can effectively promote the rapid development of compressed air energy storage technology and industry, and further consolidate China's international leading position in the field of compressed air energy storage, it lays a solid foundation for the large-scale popularization and application of this technology. Shandong Huaneng Design Institute Co., Ltd., as a strategic partner of China National Energy Reserve, has successively participated in the preliminary design and construction drawing design of several compressed air energy storage projects since 2020, including the 100MW advanced compressed air energy storage national demonstration power station project in Zhangjiakou, Hebei Province, the 100MW compressed air energy storage project in Nanjing Future Energy System Research Institute, the 300MW advanced compressed air energy storage national demonstration power station in Feicheng, Shandong Province, and the 100MW/400MWh compressed air storage project in Datang Zhongning, to make outstanding contributions to make the compressed air energy storage industry bigger and stronger, and to create a new type of energy storage and new quality productivity!!!

The General Institute of Electric Regulation interprets the new policy of energy storage and grid connection.

2024-04-29

Focus on solving the problem of high-efficiency utilization and promote the high-quality development of new energy storage -- Policy Interpretation of the National Energy Administration's Notice on Promoting the Grid Connection and Dispatching Application of New Energy Storage Recently, the National Energy Administration has made relevant arrangements for promoting the grid connection and dispatching application of new energy storage, and issued the Notice on Promoting the Grid Connection and Dispatching Application of New Energy Storage (hereinafter referred to as the Notice), the aim is to further standardize the grid-connected management, improve the scheduling mechanism, clarify the technical requirements, promote the new energy storage to better play the role of systematic regulation, and provide solid support for accelerating the construction of a new power system. A "notice" issued significant (I) new

Deepen communication and seek common cooperation and development

2024-04-25

On April 17, Shandong Huaneng Design Institute Co., Ltd. and Jiangxi Baitong Energy Co., Ltd. held a design consulting exchange meeting to discuss related work concepts and ideas in design management, design consulting and other sectors, solve practical problems, reach a consensus on cooperation, and create jointly Value engineering. Shandong Huaneng Design Institute Co., Ltd. An Zong, Jiangxi Baitong Energy Co., Ltd. Niu Zong, Hao Zong, Zhang Zong and all professional chief engineers attended the discussion. The meeting reached a consensus on how to realize the comprehensive deepening of cooperation between the two parties, jointly facing the market, completing good projects, and laying the tone for win-win cooperation. The meeting reviewed the history of cooperation and exchanged the market positioning and industry of both sides.

-- Policy Interpretation of the Notice of the National Energy Administration on Promoting the Grid Connection and Dispatching of New Energy Storage

2024-04-23

The report of the 20th National Congress of the Communist Party of China, Rao Hong, an academician of the Chinese Academy of Engineering, proposed to "accelerate the planning and construction of a new energy system, strengthen the construction of an energy production, supply, storage and marketing system, and ensure energy security". Energy storage is of great significance to promote energy green transformation, respond to extreme events, ensure energy security, promote high-quality energy development, and support the realization of climate change goals. In 2024, "developing new energy storage" was first written into the government work report as an important measure to actively and steadily promote carbon neutralization. As a key support force to ensure the energy demand of China's economic and social development, the new energy storage will speed up the construction of a new energy system and development.

Notice of the General Administration of Market Supervision on Issuing the Emergency Plan for Special Equipment Emergencies

2024-04-22

Notice of the General Administration of Market Supervision on Printing and Distributing Emergency Plans for Special Equipment Emergencies to All Provinces, Autonomous Regions, Municipalities Directly under the Central Government and Xinjiang Production and Construction Corps Market Supervision Bureaus (Departments, Committees), Departments and Directly Subordinate Units of the General Administration of Market Supervision Emergency Plan has been adopted at the 10th Executive Meeting of the General Administration of Market Supervision on April 1, 2024. General Administration of Market Supervision April 11, 2024 (this piece is publicly released) General Administration of Market Supervision Special Equipment Emergency Plan 1 General Provisions 1.1 Compilation Purpose to Improve State Administration of Market Supervision

Taking advantage of the situation, China's new energy storage development presses the "acceleration key"

2024-04-19

中国储能网讯:实现“双碳”目标,能源是主战场,电力是主力军。国家统计局最新数据显示,2024年一季度,全国规模以上工业产能利用率为73.6%。近日,国家能源局印发《关于促进新型储能并网和调度运用的通知》(以下简称《通知》)。《通知》提出,规范新型储能并网接入管理,优化调度运行机制,充分发挥新型储能作用,支撑构建新型电力系统。多位专家表示,新型储能是构建新型电力系统重要的技术和基础装备,是实现碳达峰碳中和目标的重要支撑。要推进新型储能技术多元发展,从试点示范走向规模化商用,助力新型能源体系建设全面提速。 科技创新助力技术突破促进能源利用降本增效随着新能源技术的不断发展,作为连接能源生产和消费的关键环节,储能技术的重要性日益凸显。相关专家指出,通过创新储能技术,可以更好地解决新能源的间歇性和不稳定性问题,提高能源利用效率。创新是发展的底色,科技创新为新型储能降本增效提供动力。近日,湖北应城300兆瓦级压气储能电站示范工程首次并网一次成功,成为世界首台(套)300兆瓦级压气储能电站。该项目创新采用“压气储能系统解决方案”,在有效提升区域电网的调峰能力的同时,促进电网消纳更多的风电、光伏等新能源。中国科学院物理研究所研究员李泓表示,新型储能技术还将与人工智能、大数据、云计算等深度融合,实现更高效、更智能的能源储存和利用。数字化技术赋能新型储能发展,为新型储能插上“智慧翅膀”。成都“光储充放”智慧微网项目现场科技感十足,光伏雨棚挺拔舒展,一排排新能源汽车正在有序充电。科技感外表下,硬核技术凸显“智慧”内核,“光储充放”整套系统集碲化镉光伏、梯次储能、电动汽车充放电于一体,实现充电网、微电网、储能网一体化互联互通。在河北唐山,我国首个电动重卡型虚拟电厂化身电力调度的智能管家,整合电网中散落的分布式光伏、充电桩、储能等电力负荷,聚合了11座重卡充换电站电池储能资源,依托数字化手段,通过智能化算法精准调控,灵活调度电力,降低电网峰谷差,促进电力供需平衡和新能源消纳。目前,唐山电动重卡型虚拟电厂最大调节能力已达2.23万千瓦。近期,重庆、广东、福建、山东等地纷纷出台了虚拟电厂有关方案或实施细则。中国电力企业联合会常务副理事长杨昆表示,作为能源智能化的新业态和新模式,虚拟电厂应用前景广泛。在电网结构向清洁低碳转型的背景下,发展虚拟电厂对促进电网供需平衡、实现分布式能源低成本并网、充分消纳清洁能源发电量、推动绿色能源转型具有重要的现实意义。支撑电力系统降碳保供伴随着风能、太阳能等新能源的快速发展,其间歇性、波动性对电网安全的影响越来越凸显。同时,气候变化因素和极端天气对电力系统的规划生产运行影响加剧,电力保供和系统平衡的问题将更加突出。建设好新型储能系统以保证能源安全和能源系统稳定运行的需求愈发迫切。《通知》指出,要准确把握新型储能功能定位,结合新型储能功能定位和市场化要求,进一步规范新型储能并网管理,持续完善新型储能调度机制,有力支撑新型电力系统建设。近年来,我国新型储能产业发展迅猛。国家能源局数据显示,截至2023年底,全国已经建成投运新型储能项目累计装机规模达3139万千瓦/6687万千瓦时,相当于1.4个三峡水电站的装机容量,可以满足2000万户居民的用电需求,平均储能时长2.1小时。2023年新增装机规模约2260万千瓦/4870万千瓦时,较2022年底增长超过260%。相较于传统储能,新型储能优势明显。宁夏宁东能源基地成功加装电网“多功能充电宝”,正式“上线”全省首个构网型储能电站。据相关负责人介绍,构网型储能电站突破了传统跟网型储能电站对电网提供的稳定电压和频率的依赖,不仅能高效充放电进行灵活削峰填谷,还能提供电力系统稳定运行的短路容量、转动惯量等核心功能要素,发挥电网“主动型调节器”作用。调峰调频、电网扩容、临时应急、新能源消纳……新型储能运用场景多元,多位专家表示,要坚守安全底线,发挥好新型储能在构建新型电力系统中的关键作用。多元主体推动市场建设强化并网调度协调保障陕西省印发《陕西省新型储能发展实施方案(2024-2025年)》,提出到2025年,力争并网新型储能总规模达到2GW以上;青海开启新能源一站式并网服务新模式,省内新受理新能源并网项目100%线上办理,实现办理业务“一次都不跑”,提升客户体验;山东省印发《支持新型储能健康有序发展若干政策措施》,鼓励新能源场站与配建储能全电量参与电力市场交易,以市场化方式倒逼新能源企业提高配建储能利用率,促进新能源与配建储能联合主体健康发展……各地加速布局新型储能产业,在提升新型储能并网服务的同时,以市场化方式促进新型储能调用。业内专家指出,随着我国电力市场化改革的稳步推进,储能应用市场必将持续扩大,各地区需要探索共享储能、云储能、储能聚合等新型商业模式以适应发展。共享储能打破了储能站与发电站“一对一”的传统对应关系,转向“一对多”关系,可以满足新能源并网所必须的配储要求。这一模式近年来在新型储能市场中地位不断上升,并网规模持续扩大。江苏首个共享式储能站累计向电网输送电力6000多万度;华南区域最大的雷州集中式共享储能电站一期项目投产送电;宁夏泾源县共享储能项目开工,总投资4.6亿;云南首个独立共享储能示范项目开建……截至目前,山东、湖南、青海、辽宁、安徽、河南、浙江、山西、云南、甘肃、河北、新疆等超过15个省区都已经出台了共享储能相关的政策。多位专家表示,发展共享储能的关键在于合理的价格形成机制和交易模式,让受益主体合理分配储能成本,投资主体获得合理回报,这需要新能源电厂、电网和储能投资主体之间加强协调。中国化学与电源行业协会储能应用分会秘书长刘勇建议,以保供应、保安全、保消纳为原则,在多元化市场机制建设引导下调用共享储能,最大化提高共享储能充放电次数,确保共享储能“能调则调,多调多用

The largest distributed energy storage project in China has been put into operation

2024-04-17

Recently, the largest distributed energy storage project in China designed by China Energy Construction Shaanxi Institute, the first user-side distributed energy storage project in China, the distributed energy storage project in Shaanxi Province's large-scale distribution station area, was completed and put into operation! The project has deployed and installed 149 sets of distributed energy storage equipment in the station area, covering an area of nearly 8000 square kilometers in Guanzhong, southern Shaanxi and other counties and cities in Shaanxi. Since the start of the project, China Energy Construction Shaanxi Institute has surveyed 422 distribution station areas. Through solid investigation of the historical data of the station area and detailed analysis of the operation characteristics of the station area, it has put forward a targeted energy storage solution. It has made full use of the rapid response and flexible adjustment of the energy storage system to effectively solve the problems of the problems of the problems of the problems of voltage limit and distributed the flexible adjustment capacity of the station area and the flexibility of the operation of the distribution network extend the reading station area energy storage refers to the distribution network, by installing energy storage equipment (such as batteries, super capacitors, etc.) to achieve the storage and release of electrical energy to balance the grid load and improve the reliability of power supply technology. This kind of energy storage equipment is usually installed in the power distribution station or station area where the distribution transformer is located, which is used to deal with the instantaneous load fluctuation and peak load demand in the distribution network, improve the stability and response speed of the power grid, and play an important role in peak filling, peak supply, safety and stability, frequency regulation and so on. With the comprehensive and high-quality development of the economy and society, the demand for electricity in the rural power grid is increasing year by year, and some mountain villages are scattered and far away from the main power supply network, and there are heavy overload and low voltage problems caused by the large power supply radius, which is difficult to meet the customer's requirements for power quality. At the same time, the problem of overvoltage and photovoltaic consumption caused by the rapid development of photovoltaic is difficult to achieve dynamic governance in a short time. When the station is faced with heavy overload and voltage limit, the energy storage system can respond quickly to provide the necessary power support, and at the same time can effectively balance the grid voltage and prevent the occurrence of voltage limit problems. Through real-time monitoring and analysis of the three-phase voltage and current of the distribution network, the energy storage system accurately adjusts the current distribution of each phase and balances the voltage amplitude of each phase, thereby improving the power supply quality and operating efficiency of the distribution network. Through the sharing of energy storage microgrid by the station group, the surplus electricity generated by photovoltaic power generation during the day between villages will be automatically stored in the energy storage system or consumed across the station area. When the electricity load of villagers increases at night, the energy storage system automatically releases electric energy to assist in adjusting the balance of supply and demand, thus playing the role of peak cutting and valley filling.

The soul of the Yellow River, red heritage "pursuit of the Yellow River story continuously red blood"

2024-04-15

In order to implement Xi Jinping's thought on ecological civilization, carry out the theme education of Xi Jinping's thought on socialism with Chinese characteristics in the new era, tell the “Yellow River story” and continue the red cultural lineage.
< 1...8910...30 >